Replacement of existing fuel storage infrastructure with new 1-million-litre diesel tanks designed and inspected to API 650. The project included tank demolition, site preparation, new tank erection, cathodic protection systems, secondary containment, and integration with the existing refueling distribution network. A critical requirement was maintaining full site operations throughout construction — no shutdown was permitted.
We are always interested in hearing about new challenges.